Case Studies
Tristar is often called upon to tackle complex and difficult rebuild or fabrication projects, usually on a strict time line. The following studies are a sampling of some of those challenging projects which Tristar has successfully completed. Innovation, quality and providing reliable solutions to customer problems are a hallmark of Tristar’s business.
Sump Pump Repair
62,000lb Sump Pump Failure – High vibration levels detected. Waste Treatment Facility.
(
228KB)
Flash Tank Fabrication
Aging Carbon Steel Flash Tanks – Heavy corrosion causing tank failure.
(
141KB)
Military Rescue Submarine System
A Vancouver, BC design, fabrication & maintenance company specializing in submarine rescue systems.
(
70KB)
Diesel Pile Driver
Castrophic Piston Failure, 48,000lb Diesel Pile Driver.
Vancouver Convention Centre construction site.(
235KB)
Steam Vessel Housing
Fabricate a 2205 Duplex S.S. Steam Vessel Housing
for a large production pulp mill.
(
150KB)
Turbine Driven Armature Repair
Turbine Driven Armature Repair – A Vancouver, BC Thermal Generating Station.
(
98KB)







